Glossary
AC
See Actual Cost
Acceptance Criteria
A set of conditions that a deliverable, product backlog item, or user story must meet before it can be accepted or considered complete.
Accountable Leader
A project professional who takes responsibility, involves the right people, and makes ethical and responsible decisions in support of project success.
Accuracy
Within the quality management system, accuracy is an assessment of correctness.
Activity List
A documented tabulation of schedule activities that shows the activity description, activity identifier, and a sufficiently detailed scope of work description so project team members understand what work is to be performed.
Actual Cost (AC)
The realized cost incurred for the work performed on an activity during a specific time period.
Adaptive Approach
A development approach suited to high uncertainty and change, where teams learn through short cycles, feedback, and adaptation.
Adaptive Coordination Meeting
A short, frequent meeting in which team members coordinate work, identify impediments, and adapt their plan. In Scrum, the comparable event is the Daily Scrum.
Affinity Diagram
A diagram that shows large numbers of ideas classified into groups for review and analysis.
Affinity Grouping
The process of classifying items into similar categories or collections on the basis of their likeness.
Agile
A mindset and family of approaches based on the values and principles of the Agile Manifesto, emphasizing early and continuous delivery of value, collaboration, feedback, and adaptation.
Agile Coach
A person who helps teams and organizations adopt and improve agile ways of working, usually across a broader scope than a single Scrum Team.
Agile Manifesto
The four values and twelve principles that established the foundation for modern agile ways of working.
Agile Mindset
A way of thinking and behaving that emphasizes value, collaboration, adaptation, feedback, quality, and continuous improvement.
Agile Principles
The twelve principles of agile project delivery as embodied in the Agile Manifesto.
AI Governance
The policies, decision rights, controls, and accountability mechanisms used to ensure artificial intelligence is applied responsibly, securely, ethically, and transparently.
Alternative Dispute Resolution (ADR)
Methods of resolving disputes outside of court, such as negotiation, mediation, and arbitration.
Alternatives Analysis
A method used to evaluate identified options in order to select the options or approaches to use to perform the work of the project.
Ambiguity
A state of being unclear, having difficulty in identifying the cause of events, or having multiple options from which to choose.
Analogous Estimating
A method for estimating the duration or cost of an activity or a project using historical data from a similar activity or project.
Artifact
A document, model, output, or other item created to help manage the project or communicate useful information.
Artificial Intelligence (AI)
Technology that can generate outputs, identify patterns, analyze information, or support decisions in ways that simulate aspects of human intelligence. AI outputs require appropriate human review and verification.
Assumption
A factor in the planning process that is considered to be true, real, or certain, without proof or demonstration.
Assumption and Constraint Analysis
An assessment that ensures assumptions and constraints are integrated into the project plans and documents, and that there is consistency among them.
Assumption Log
A project document used to record all assumptions and constraints throughout the project.
Authority
The right to apply project resources, expend funds, make decisions, or give approvals.
BAC
See Budget At Completion
Backlog
An ordered list of work to be done.
Backlog Refinement
Progressive elaboration of the content in the backlog and (re)prioritization of it to identify the work that can be accomplished in an upcoming iteration.
Baseline
An approved version of a work product used as the basis for comparison with actual results and changed only through the applicable change-control process.
Basis of Estimates
Documentation explaining how an estimate was developed, including assumptions, constraints, methods, ranges, and confidence levels.
Be an Accountable Leader
A PMBOK principle that calls on project professionals to take responsibility, act ethically, involve the right people, and own the consequences of decisions.
Benchmarking
The comparison of actual or planned products, processes, and practices to those of comparable organizations to identify best practices, generate ideas for improvement, and provide a basis for measuring performance.
Benefit
A gain or advantage realized by the organization, customer, users, or other stakeholders as a result of project outcomes.
Benefits Management Plan
The documented explanation defining the processes for creating, maximizing, and sustaining the benefits provided by a project or program.
Benefits Realization
The process of achieving, sustaining, and measuring the intended benefits of a project’s outputs and outcomes.
Bid Documents
All documents used to solicit information, quotations, or proposals from prospective sellers.
Bidder Conference
The meeting with prospective sellers prior to the preparation of a bid or proposal to ensure all prospective vendors have a clear and common understanding of the procurement. Also known as a contractor conference, vendor conference, or pre-bid conference.
Blocker
See Impediment.
Bottleneck
A point in a workflow where work accumulates because capacity is lower than the demand placed on it.
Budget
The approved estimate for the project or any work breakdown structure (WBS) component or any schedule activity.
Budget at Completion (BAC)
The sum of all budgets established for the work to be performed.
Build an Empowered Culture
A PMBOK principle that emphasizes trust, collaboration, psychological safety, shared accountability, and enabling people to do their best work.
Burndown Chart
A chart that shows how much work remains over time within a timebox, iteration, or release.
Burnup Chart
A chart that shows completed work over time and may also show total scope so changes in scope are visible.
Business Case
A document or value proposition that explains the business need, evaluates options, and supports a decision on whether a proposed project should proceed.
Business Outcome
A change in capability, performance, behaviour, or condition produced by project deliverables and used to create benefits and value.
Business Value
The tangible or intangible benefit created for an organization and its stakeholders.
Card, Conversation, Confirmation (3 Cs)
A way to understand user stories: the Card records a short reminder, the Conversation develops shared understanding, and Confirmation defines how completion will be verified.
Cause-and-Effect Diagram
A visual tool used to explore potential causes of a problem or effect and support root cause analysis. Also called a fishbone or Ishikawa diagram.
CCB
See Change Control Board
Change
A modification to any formally controlled deliverable, project management plan component, or project document.
Change Control
The process used to identify, document, evaluate, approve, defer, or reject proposed changes.
Change Control Board (CCB)
A formally chartered group responsible for reviewing, evaluating, approving, delaying, or rejecting changes to the project, and for recording and communicating such decisions.
Change Control Plan
The component of the project management plan that defines how changes will be submitted, evaluated, decided, recorded, and communicated.
Change Control System
A set of procedures that describes how modifications to the project deliverables and documentation are managed and controlled.
Change Log
A comprehensive list of changes submitted during the project and their current status.
Change Management
A comprehensive, cyclic, and structured approach for transitioning individuals, groups, and organizations from a current state to a future state with intended business benefits.
Change Request
A formal proposal to modify a document, deliverable, or baseline.
Charter
See Project Charter and Team Charter.
Check Sheet
A tally sheet that can be used when gathering data.
Claim
A request or assertion by one party that it is entitled to payment, compensation, or another remedy under the terms of a contract.
Closing Focus Area
The PMBOK focus area concerned with formally completing a project, phase, or contract, obtaining acceptance, transitioning outcomes, releasing resources, and capturing knowledge.
Commons and Caves
An agile workspace concept that provides shared areas for collaboration and quiet areas for focused individual work.
Communications Management Plan
A component of the project, program, or portfolio management plan that describes how, when, and by whom information about the project will be administered and disseminated.
Complexity
A characteristic of a program or project or its environment that is difficult to manage due to human behavior, system behavior, and ambiguity.
Conformance
The degree to which the results meet the set quality requirements.
Constraint
A limiting factor that affects the execution of a project, program, portfolio, or process.
Contingency
An event or occurrence that could affect the execution of the project, which may be accounted for with a reserve.
Contingency Reserve
Time or money included in the schedule or cost baseline to address identified risks and their planned responses.
Continuous Delivery
The practice of delivering feature increments immediately to customers, often through the use of small batches of work and automation technology.
Continuous Improvement
The ongoing practice of inspecting results and ways of working, learning from feedback, and making incremental improvements.
Continuous Integration
A practice in which each team member’s work products are frequently integrated and validated with one another.
Contract
A mutually binding agreement that obligates the seller to provide the specified product, service, or result and obligates the buyer to pay for it.
Control
The process of comparing actual performance with planned performance, analyzing variances, assessing trends to effect process improvements, evaluating possible alternatives, and recommending appropriate corrective action as needed.
Control Chart
A time-ordered chart used to assess whether a process is stable by comparing results with established control limits and looking for unusual patterns.
COQ
See Cost Of Quality
Cost Baseline
The approved version of the time-phased project budget, excluding any management reserves, which can be changed only through formal change control procedures and is used as a basis for comparison to actual results.
Cost Management Plan
A component of a project or program management plan that describes how costs will be planned, structured, and controlled.
Cost of Quality (COQ)
The total cost of preventing defects, evaluating conformance, and addressing failures or nonconformance.
Cost Performance Index (CPI)
A measure of the cost efficiency of budgeted resources expressed as the ratio of earned value to actual cost.
Cost Plus Award Fee Contract (CPAF)
A category of contract that involves payments to the seller for all legitimate actual costs incurred for completed work, plus an award fee representing seller profit.
Cost Plus Fixed Fee Contract (CPFF)
Cost Plus Fixed Fee Contract (CPFF). A type of cost-reimbursable contract where the buyer reimburses the seller for the seller’s allowable costs (allowable costs are defined by the contract) plus a fixed amount of profit (fee).
Cost Plus Incentive Fee Contract (CPIF)
A type of cost-reimbursable contract where the buyer reimburses the seller for the seller’s allowable costs (allowable costs are defined by the contract), and the seller earns its profit if it meets defined performance criteria.
Cost Variance (CV)
The amount of budget deficit or surplus at a given point in time, expressed as the difference between the earned value and the actual cost.
Cost-Benefit Analysis
A financial analysis method used to determine the benefits provided by a project against its costs.
Cost-Reimbursable Contract
A type of contract involving payment to the seller for the seller’s actual costs, plus a fee typically representing the seller’s profit.
CPAF
See Cost Plus Award Fee
CPFF
See Cost Plus Fixed Fee
CPI
See Cost Performance Index
CPIF
See Cost Plus Incentive Fee
CPM
See Critical Path Method
Crashing
A method used to shorten the schedule duration for the least incremental cost by adding resources.
Criteria
Standards, rules, or tests on which a judgment or decision can be based or by which a product, service, result, or process can be evaluated.
Critical Path
The longest-duration path through the project schedule network, which determines the shortest possible project duration.
Critical Path Method (CPM)
A method used to estimate the minimum project duration and determine the amount of schedule flexibility on the logical network paths within the schedule model.
Cross-Functional Team
A team that collectively has the skills needed to create a usable product increment or deliver the intended value.
Crystal
A family of agile approaches that emphasizes people, communication, and tailoring the method to the size and criticality of the work.
CV
See Cost Variance
Daily Scrum
A 15-minute Scrum event for the Developers to inspect progress toward the Sprint Goal and adapt their plan for the next working day.
Daily Standup
See Daily Scrum.
Dashboard
A set of charts and graphs showing progress or performance against important measures of the project.
Data Gathering and Analysis Methods
Methods used to collect, assess, and evaluate data and information to gain a deeper understanding of a situation.
Decomposition
A method used for dividing and subdividing the project scope and project deliverables into smaller, more manageable parts.
Dedicated Team
A focused team that minimizes context switching by concentrating on one product or backlog.
Definition of Done (DoD)
A shared standard describing the conditions an Increment must satisfy before it is considered complete. Work that does not meet the Definition of Done is not part of the Increment.
Definition of Ready (DoR)
A practical checklist some agile teams use to confirm that a user story is sufficiently understood, estimated, and small enough to begin work.
Deliverable
Any unique and verifiable product, result, or capability to perform a service that is required to be produced to complete a process, phase, or project.
Demonstration
See Sprint Review.
Developers
The members of a Scrum Team who create the usable Increment. They are cross-functional and self-managing and decide how to perform the work.
Development Approach
A method used to create and evolve the product, service, or result during the project life cycle, such as a predictive, adaptive, or hybrid method.
Disciplined Agile
A toolkit that helps teams choose and tailor a way of working based on their context rather than prescribing one fixed method.
Discretionary Dependency
A relationship that is based on best practices or project preferences.
DoD
See Definition Of Done
DoR
See Definition of Ready.
Duration
The total number of work periods required to complete an activity or work breakdown structure component, expressed in hours, days, or weeks. Contrast with effort.
EAC
See Estimate At Completion
Earned Value (EV)
The measure of work performed expressed in terms of the budget authorized for that work.
Earned Value Analysis (EVA)
An analysis method that uses a set of measures associated with scope, schedule, and cost to determine the cost and schedule performance of a project. Also known as Earned Value Management (EVM).
EEF
See Enterprise Environmental Factors
Effort
The labour required to complete an activity or work package, commonly expressed in person-hours or person-days. Contrast with duration.
Elicitation
The activity of drawing out information from stakeholders and other sources.
Embed Quality into Processes and Deliverables
A PMBOK principle that calls for quality to be designed and built into the work rather than inspected only at the end.
Emotional Intelligence
The ability to recognize, understand, and manage one's own emotions and respond effectively to the emotions of others.
EMV
See Expected Monetary Value
Enterprise Environmental Factors (EEF)
Conditions, not under the immediate control of the team, that influence, constrain, or direct the project, program, or portfolio.
Epic
A large body of work that is too large to complete in a single Sprint and is broken down into smaller user stories or product backlog items.
Estimate
A quantitative assessment of the likely amount or outcome of a variable, such as project costs, resources, effort, or durations.
Estimate at Completion (EAC)
The forecast total cost of completing all project work.
Estimate to Complete (ETC)
The expected cost to finish all the remaining project work.
Estimating Methods
Methods used to develop an approximation of work, time, or cost on a project.
ETC
See Estimate To Complete
EV
See Earned Value
EVA
See Earned Value Analysis
Executing Focus Area
The PMBOK focus area concerned with coordinating people and resources, producing deliverables, engaging stakeholders, and performing the planned work.
Expected Monetary Value (EMV)
The probability-weighted financial value of an uncertain outcome, often calculated by multiplying each outcome's probability by its monetary impact.
Explicit Knowledge
Knowledge that can be codified using symbols such as words, numbers, and pictures.
External Dependency
A relationship between project work and an activity outside the project team's control.
Extreme Programming (XP)
An agile software-development approach emphasizing technical excellence through practices such as pair programming, test-driven development, continuous integration, and frequent releases.
Fast Tracking
A schedule compression method in which activities normally performed sequentially are overlapped or performed in parallel, increasing risk.
Feature
A related set of capabilities or requirements that provides value to a customer, user, or organization.
FFP
See Firm Fixed Price
Finance Performance Domain
The PMBOK performance domain concerned with estimating, funding, budgeting, financial performance, and the responsible use of project funds.
Firm Fixed Price Contract (FFP)
A type of fixed-price contract where the buyer pays the seller a set amount (as defined by the contract), regardless of the seller’s costs.
Fixed Duration
A type of activity where the length of time required to complete the activity remains constant regardless of the number of people or resources assigned to the activity.
Fixed Price Incentive Fee Contract (FPIF)
A type of contract where the buyer pays the seller a set amount (as defined by the contract), and the seller can earn an additional amount if the seller meets defined performance criteria.
Fixed Price with Economic Price Adjustment Contract (FPEPA)
A fixed-price contract, but with a special provision allowing for predefined final adjustments to the contract price due to changed conditions, such as inflation changes, or cost increases (or decreases) for specific commodities.
Flowchart
The depiction in a diagram format of the inputs, process actions, and outputs of one or more processes within a system.
Focus on Value
A project management principle that directs project decisions and work toward outcomes and benefits that create value for stakeholders.
Forecast
An estimate or prediction of conditions and events in the project’s future based on information and knowledge available at the time of the forecast.
FPEPA
See Fixed Price With Economic Price Adjustment
FPIF
See Fixed Price Incentive Fee
Functional Requirement
A specific behavior that a product or service should perform.
Gantt Chart
A bar chart of schedule information where activities are listed on the vertical axis, dates are shown on the horizontal axis, and activity durations are shown as horizontal bars placed according to start and finish dates.
Governance
The framework of decision rights, policies, controls, responsibilities, and oversight used to direct a project and maintain accountability.
Governance Performance Domain
The PMBOK performance domain concerned with decision-making, oversight, accountability, alignment, controls, and the structures used to direct the project.
Grade
A category or rank used to distinguish items that have the same functional use but do not share the same requirements for quality.
Hierarchy Chart
A chart that begins with high-level information that is progressively decomposed into lower levels of detail.
Histogram
A chart showing the frequency distribution of numerical data.
Human in the Loop
An approach in which a person reviews, challenges, verifies, and remains accountable for outputs or recommendations produced by artificial intelligence.
Hybrid Approach
A development approach that intentionally combines predictive and adaptive elements to suit the project's context, uncertainty, governance, and delivery needs.
IDIQ
See Indefinite Delivery Indefinite Quantity
Impediment
An obstacle that prevents the team from achieving its objectives. Also known as a blocker.
Increment
A usable, additive step toward the Product Goal. When a Product Backlog item meets the Definition of Done and works with previous Increments, it becomes part of the Increment.
Incremental Approach
A development approach that adds usable capability in successive pieces until the product or deliverable is complete.
Incremental Life Cycle
An approach that provides finished deliverables that the customer may be able to use immediately.
Indefinite Delivery Indefinite Quantity (IDIQ)
A contract that provides for an indefinite quantity of goods or services, with a stated lower and upper limit, within a fixed time period.
Information Radiator
A visible display, physical or digital, that provides useful project or team information at a glance and supports transparency.
Initiating Focus Area
The PMBOK focus area concerned with authorizing the project or phase, clarifying purpose and objectives, identifying key stakeholders, and establishing initial direction.
Integrate Sustainability Within All Project Areas
A PMBOK principle that calls for economic, environmental, and social considerations to be integrated into decisions throughout the project.
Internal Dependency
A logical relationship between two or more project activities within the project's control.
Interpersonal Skills
Skills used to build and maintain effective relationships, including communication, collaboration, influence, negotiation, and conflict management.
Issue
A current condition or situation that may affect project objectives and requires attention or resolution.
Issue Log
A project document used to record, assign, monitor, and resolve issues.
Iteration
A timeboxed cycle in which a team performs the work needed to create or improve a usable product or deliverable.
Iteration Planning
A collaborative activity used to determine the goal, selected work, and delivery plan for an upcoming iteration. In Scrum, this is Sprint Planning.
Iteration Review
A collaborative review of completed work with stakeholders to gather feedback and adapt future work.
Iterative Approach
A development approach that creates an initial version and progressively improves it through repeated cycles of feedback and learning.
Iterative Life Cycle
An approach that allows feedback for unfinished work to improve and modify that work.
Kanban Board
A visual board used to show the flow of work, limit work in progress, expose blockers and bottlenecks, and support pull-based delivery.
Kanban Method
A flow-based approach that visualizes work, limits work in progress, pulls new work based on capacity, and improves the system continuously.
Kickoff Meeting
A meeting at the beginning of project execution used to align the team and key stakeholders on expectations, objectives, roles, and ways of working.
Knowledge
A mixture of experience, values and beliefs, contextual information, intuition, and insight that people use to make sense of new experiences and information.
Lag
The amount of time whereby a successor activity will be delayed with respect to a predecessor activity.
Lead
An acceleration that allows a successor activity to begin before its predecessor is fully complete.
Lead Time
The time between a customer request and the actual delivery.
Lean
An approach focused on maximizing customer value, improving flow, reducing waste, and continuously improving the system.
Lessons Learned
Knowledge gained from experience that can improve current or future project performance.
Lessons Learned Register
A project document used to record knowledge gained during a project, phase, or iteration so that it can be used to improve future performance for the team and the organization.
Life Cycle
The sequence of stages through which a project, product, or other initiative passes from beginning to end. See Project Life Cycle and Product Life Cycle.
Life Cycle Assessment (LCA)
A tool used to evaluate the total environmental impact of a product, process, or system.
Log
A record used to document and monitor evolving project information, such as assumptions, changes, issues, or risks.
Make-or-Buy Analysis
An analysis used to decide whether work or a product should be produced internally or acquired from an external seller.
Management Reserve
Time or money held outside the baseline for unforeseen work within the project scope and controlled by management.
Mandatory Dependency
A relationship that is contractually required or inherent in the nature of the work.
Methodology
A system of practices, techniques, procedures, and rules used by those who work in a discipline.
Metric
A description of a project or product attribute and how to measure it.
Milestone
A significant point or event in a project, program, or portfolio that has zero duration.
Milestone Schedule
A type of schedule that presents milestones with planned dates.
Minimum Viable Product (MVP)
The smallest useful version of a product that delivers real value and enables learning from feedback before further investment.
Modeling
Creating simplified representations of systems, solutions, or deliverables, such as prototypes, diagrams, or storyboards.
Monitor
Collecting and communicating performance information and observing project conditions without necessarily taking corrective action.
Monitoring and Controlling Focus Area
The PMBOK focus area concerned with comparing actual performance with the plan, analyzing variances and trends, managing changes, and taking corrective or preventive action.
Monte Carlo Simulation
A method of identifying the potential impacts of risk and uncertainty using multiple iterations of a computer model to develop a probability distribution of a range of outcomes that could result from a decision or course of action.
Multipoint Estimating
A method used to estimate cost or duration by applying an average or weighted average of optimistic, pessimistic, and most likely estimates when there is uncertainty with the individual activity estimates.
MVP
See Minimum Viable Product
Network Path
A sequence of activities connected by logical relationships in a project schedule network diagram.
Objective
A specific result, position, product, service, or outcome toward which work is directed.
OPA
See Organizational Process Assets
Opportunity
A risk that would have a positive effect on one or more project objectives.
Organizational Process Assets (OPA)
Plans, processes, policies, procedures, and knowledge bases that are specific to and used by the performing organization.
Outcome
A result or change produced through the use of project deliverables and capabilities. Outcomes create benefits and value.
Pair Programming
An Extreme Programming practice in which two people work together on the same code or technical task, continuously reviewing and improving the work.
Parametric Estimating
An estimating method in which an algorithm is used to calculate cost or duration based on historical data and project parameters.
Parkinson's Law
The principle that work tends to expand to fill the time available for its completion.
Persona
A fictional representation of a target user or customer based on research and real user data, including goals, behaviours, needs, and pain points.
PERT
See Program Evaluation Review Technique
Phase Gate
A review at the end of a phase where authorized stakeholders decide whether to continue, modify, pause, or terminate the project or program.
Plan
A proposed means of accomplishing something.
Plan-Do-Check-Act (PDCA)
An iterative cycle used to plan an improvement, implement it, evaluate the results, and act on what was learned.
Planned Value (PV)
The authorized budget assigned to work scheduled to be completed by a specified date.
Planning Fallacy
The tendency to underestimate how long work will take, even when previous experience suggests it may take longer.
Planning Focus Area
The PMBOK focus area concerned with defining the work, developing plans and baselines, estimating resources and costs, identifying risks, and establishing how the project will be delivered and controlled.
Planning Poker
A collaborative relative-estimating technique in which team members privately choose estimates, reveal them simultaneously, discuss differences, and estimate again as needed.
PMBOK
See Project Management Body of Knowledge
PMO
See Project Management Office
Portfolio
Projects, programs, subsidiary portfolios, and operations managed as a group to achieve strategic objectives.
Portfolio Management
The centralized management of portfolios to select, prioritize, authorize, and oversee work that supports organizational strategy.
Precision
Within quality management, precision is an assessment of exactness or repeatability.
Predictive Approach
A development approach in which scope, schedule, and cost are planned in substantial detail early in the life cycle and work is managed against approved baselines.
Predictive Life Cycle
A sequential life cycle in which most planning occurs before execution and the completed solution is delivered through planned phases.
Probability and Impact Matrix
A grid for mapping the probability of occurrence of each risk and its impact on project objectives if that risk occurs.
Procurement Management Plan
The component of the project management plan describing how products, services, or results will be acquired from outside the project team or organization.
Product
A quantifiable artifact, component, service, or end item created to deliver capability or value.
Product Backlog
An emergent, ordered list of what is needed to improve the product. The Product Owner is accountable for its content and order.
Product Backlog Refinement
An ongoing, collaborative activity in which Product Backlog items are clarified, split, estimated, and prepared for possible selection in future Sprint Planning. It is not a formal Scrum event.
Product Goal
The long-term objective for the Scrum Team and the commitment associated with the Product Backlog.
Product Life Cycle
A series of phases that represent the evolution of a product, from concept through delivery, growth, maturity, and to retirement.
Product Management
The integration of people, data, processes, and business systems to create, maintain, and evolve a product or service throughout its life cycle.
Product Owner
The Scrum Team member accountable for maximizing product value and for effective Product Backlog management, including its content and order.
Product Roadmap
A high-level, adaptable view of the intended direction, major outcomes, and releases expected to move a product toward its vision and goals.
Product Scope
The features and functions that characterize a product, service, or result.
Product Vision
A concise description of the desired future for a product, including the problem it will solve, who it will serve, and why it should exist.
Program
Related projects, subsidiary programs, and program activities that are managed in a coordinated manner to obtain benefits not available from managing them individually.
Program Evaluation Review Technique
A weighted three-point estimating method using optimistic, most likely, and pessimistic estimates, with the most likely estimate weighted four times.
Program Management
The application of knowledge, skills, and principles to a program to achieve the program objectives and obtain benefits and control not available by managing program components individually.
Progressive Elaboration
Increasing the detail and accuracy of plans and estimates as more information becomes available.
Project
A temporary initiative in a unique context undertaken to create value.
Project Calendar
A calendar that identifies working days and shifts that are available for scheduled activities.
Project Charter
A document issued by the sponsor or initiator that formally authorizes the project, establishes high-level direction, and gives the project manager authority to apply organizational resources.
Project Final Report
A document that summarizes the project's results, evaluates performance against its objectives, and records key outcomes, lessons learned, and any outstanding matters at closure.
Project Governance
The decision-making, oversight, accountability, and control framework used to direct the project and keep it aligned with organizational objectives and intended value.
Project Handover
The transfer of project deliverables and responsibility for their ongoing use, operation, and support to the customer or receiving organization, including the necessary documentation, knowledge, and training.
Project Life Cycle
The series of phases that a project passes through from its start to its completion.
Project Management
The application of knowledge, skills, tools, and techniques to project activities to meet or exceed the intended value.
Project Management Body of Knowledge (PMBOK)
The evolving body of knowledge within the project management profession, including generally recognized practices, concepts, methods, and standards.
Project Management Focus Area
One of five logical areas used in PMBOK to organize project management work: Initiating, Planning, Executing, Monitoring and Controlling, and Closing.
Project Management Office (PMO)
An organizational structure that supports, standardizes, governs, or directly manages project-related work, depending on its mandate.
Project Management Plan
The document that describes how the project will be executed, monitored and controlled, and closed.
Project Management Team
The members of the project team who are directly involved in project management activities.
Project Manager
The person assigned to lead the project team in achieving project objectives and delivering intended value.
Project Phase
A collection of logically related project activities that culminates in one or more deliverables or outcomes.
Project Schedule
An output of a schedule model that presents linked activities with planned dates, durations, milestones, and resources.
Project Scope
The work performed to deliver a product, service, or result with the specified features and functions.
Project Scope Statement
A description of the project scope, major deliverables, exclusions, assumptions, and constraints.
Project Success
The degree to which a project achieves its objectives, intended outcomes, benefits, and value while meeting the needs and expectations of intended beneficiaries and other stakeholders.
Project Team
The people who perform the project work and collaborate to achieve its objectives.
Prototype
A working model used to explore a solution and obtain early feedback before full development.
Psychological Safety
A shared belief that people can speak up, ask questions, raise concerns, admit mistakes, and contribute ideas without fear of humiliation or punishment.
Pull System
A workflow system in which new work is started only when capacity is available, rather than being pushed into the system regardless of current workload.
PV
See Planned Value
Quality
The degree to which a product, service, result, or process fulfils requirements and is fit for its intended purpose.
Quality Management Plan
A component of the project or program management plan that describes how applicable policies, procedures, and guidelines will be implemented to achieve the quality objectives.
Quality Metrics
A description of a project or product attribute and how to measure it.
Quality Report
A project document summarizing quality results, issues, findings, trends, and recommendations for improvement or corrective action.
RACI
Responsible, Accountable, Consulted, Informed. See RACI Chart.
RACI Chart
A responsibility assignment matrix showing who is Responsible, Accountable, Consulted, and Informed for project work or deliverables.
RAM
See Responsibility Assignment Matrix
RBS
See Risk Breakdown Structure or Resource Breakdown Structure, depending on context.
Register
A living record of evolving project information, such as risks, stakeholders, issues, or defects.
Regression Analysis
An analytical method where a series of input variables are examined in relation to their corresponding output results in order to develop a mathematical or statistical relationship.
Regulations
Requirements imposed by a governmental body. These requirements can establish product, process, or service characteristics, including applicable administrative provisions that have government-mandated compliance.
Relative Estimating
Estimating work by comparing its size, complexity, risk, uncertainty, and effort with other work rather than assigning an absolute duration or cost.
Release
One or more product components or increments made available to customers or users at the same time.
Release Plan
The plan that sets expectations for the dates, features, and/or outcomes expected to be delivered over the course of multiple iterations.
Release Planning
The activity of developing and adapting a high-level plan for releasing or transitioning increments of value.
Requirement
A condition or capability needed in a product, service, or result to satisfy a business or stakeholder need.
Requirements Documentation
A record of product requirements and other product information, along with whatever is recorded to manage it.
Requirements Management Plan
The component of the project or program management plan describing how requirements will be elicited, analyzed, documented, traced, prioritized, and controlled.
Requirements Traceability Matrix (RTM)
A grid that traces each requirement from its source through business need, objectives, deliverables, acceptance criteria, testing, and value.
Reserve
Time or money set aside to address uncertainty and risk, such as contingency reserve or management reserve.
Reserve Analysis
An analysis used to determine whether remaining schedule or budget reserves are sufficient for the project's remaining uncertainty and risk.
Residual Risk
Risk that remains after a risk response has been implemented.
Resource Breakdown Structure
A hierarchical representation of resources by category and type.
Resource Management Plan
The component of the project management plan describing how resources will be estimated, acquired, allocated, developed, managed, and released.
Resources Performance Domain
The PMBOK performance domain concerned with people, physical resources, team capability, leadership, and the effective allocation and use of resources.
Responsibility Assignment Matrix (RAM)
A grid linking project work with the individuals or groups responsible for it.
Result
An output or effect produced by project work. See also Deliverable and Outcome.
Retrospective
See Sprint Retrospective or Iteration Retrospective.
Rework
Action taken to bring a defective or nonconforming component into compliance with requirements or specifications.
Risk
An uncertain event or condition that, if it occurs, has a positive or negative effect on one or more project objectives.
Risk Acceptance
A response in which the team acknowledges a threat or opportunity and does not take proactive action beyond monitoring or establishing a contingency.
Risk Appetite
The degree of uncertainty an organization or individual is willing to accept in pursuit of value or reward.
Risk Avoidance
A threat response in which the team changes the plan to eliminate the threat or protect the project from its impact.
Risk Breakdown Structure (RBS)
A hierarchical representation of potential sources of risks.
Risk Enhancement
An opportunity response that increases the probability or positive impact of the opportunity.
Risk Escalation
A response used when a risk is outside the project team's authority or influence and ownership is transferred to the appropriate higher level.
Risk Exploitation
An opportunity response that acts to ensure the opportunity occurs.
Risk Exposure
A measure of the potential effect of risk, often combining probability and impact or summarizing aggregate risk.
Risk Management Plan
A component of the project, program, or portfolio management plan that describes how risk management activities will be structured and performed.
Risk Mitigation
A threat response that reduces the probability of occurrence or the negative impact of the threat.
Risk Owner
The person responsible for monitoring a risk and ensuring that an appropriate risk response is planned and implemented.
Risk Performance Domain
The PMBOK performance domain concerned with uncertainty, threats, opportunities, resilience, and the identification, analysis, response, and monitoring of risk.
Risk Register
A project document containing detailed information about individual risks, including causes, effects, owners, triggers, assessments, and responses.
Risk Report
A project document summarizing overall project risk and significant information about individual risks, trends, and required decisions.
Risk Sharing
An opportunity response that allocates ownership to a third party best able to capture the benefit.
Risk Threshold
The level of exposure or variation that triggers action and reflects stakeholder or organizational risk appetite.
Risk Transfer
A threat response that shifts financial consequences and ownership of the response to a third party, usually through a contract, insurance, or warranty.
Roadmap
See Product Roadmap.
Rolling Wave Planning
An iterative planning method in which the work to be accomplished in the near term is planned in detail, while the work in the future is planned at a higher level.
Root Cause Analysis
An analytical method used to identify the underlying cause of a problem, defect, variance, or risk rather than addressing only symptoms.
S-Curve
A graph displaying cumulative cost, effort, or other measures over time, often used to compare planned and actual performance.
Sandbagging
Intentionally padding an estimate to protect against pressure, uncertainty, blame, or the risk that the estimate will be reduced.
Scatter Diagram
A graph that shows the relationship between two variables.
Schedule Baseline
The approved version of a schedule model that can be changed using formal change control procedures and is used as the basis for comparison to actual results.
Schedule Compression
A method used to shorten the schedule duration without reducing the project scope.
Schedule Forecast
A prediction of future schedule conditions based on current performance and information.
Schedule Management Plan
A component of the project or program management plan that establishes the criteria and the activities for developing, monitoring, and controlling the schedule.
Schedule Model
A representation of the plan for executing the project’s activities including durations, dependencies, and other planning information, used to produce a project schedule along with other scheduling artifacts.
Schedule Network Diagram
A visual map of activities and their dependencies used to calculate the critical path.
Schedule Performance Domain
The PMBOK performance domain concerned with sequencing, estimating, developing, monitoring, and adapting the project schedule.
Schedule Performance Index (SPI)
A measure of schedule efficiency expressed as the ratio of earned value to planned value.
Schedule Variance (SV)
A measure of schedule performance expressed as the difference between the earned value and the planned value.
Scope
The products, services, results, and work included in a project. See Product Scope and Project Scope.
Scope Baseline
The approved version of a scope statement, work breakdown structure (WBS), and its associated WBS dictionary that can be changed using formal change control procedures and is used as the basis for comparison to actual results.
Scope Creep
The uncontrolled expansion to product or project scope without adjustments to time, cost, and resources.
Scope Management Plan
A component of the project or program management plan that describes how the scope will be defined, developed, monitored, controlled, and validated.
Scope Performance Domain
The PMBOK performance domain concerned with understanding needs, defining requirements and scope, creating deliverables, validating results, and controlling scope.
Scrum
An agile framework in which a small, cross-functional, self-managing Scrum Team delivers value through Sprints using defined accountabilities, events, artifacts, and commitments.
Scrum Master
The Scrum Team member accountable for the effectiveness of the Scrum Team by helping the team and organization understand and apply Scrum, remove impediments, and improve.
Scrum of Scrums
A coordination technique in which representatives from multiple Scrum Teams meet to manage dependencies, integration, risks, blockers, and cross-team issues.
Scrum Team
A small, cross-functional, self-managing team consisting of the Product Owner, Scrum Master, and Developers.
Scrumban
An approach that combines Scrum structure with Kanban practices such as visualizing work, limiting work in progress, and managing flow.
Secondary Risk
A new risk that arises as a direct result of implementing a risk response.
Self-Managing Team
A team that decides internally who does what, when, and how in order to achieve its objectives.
Sensitivity Analysis
An analysis method to determine which individual project risks or other sources of uncertainty have the most potential impact on project outcomes by correlating variations in project outcomes with variations in elements of a quantitative risk analysis model.
Servant Leadership
A leadership approach that puts the needs and development of others first and enables the team through listening, coaching, support, trust, and impediment removal.
Simulation
An analytical method that models the combined effect of uncertainties to evaluate their potential impact on objectives.
Single-Point Estimating
An estimating method that involves using data to calculate a single value which reflects a best guess estimate.
Social Contract
See Team Charter or Working Agreement.
SOW
See Statement Of Work.
Specification
A precise statement of the needs to be satisfied and the essential characteristics that are required.
SPI
See Schedule Performance Index
Spike
A short, timeboxed investigation used to reduce uncertainty through research, experimentation, prototyping, or answering a specific question.
Sponsor
The person or group that champions the project, provides resources and organizational support, and is accountable for enabling project success from a business perspective.
Sprint
A fixed-length Scrum event of one month or less in which ideas are turned into value. A new Sprint begins immediately after the previous Sprint ends.
Sprint Backlog
The Sprint Goal, the Product Backlog items selected for the Sprint, and the Developers' actionable plan for delivering the Increment.
Sprint Goal
The single objective for the Sprint and the commitment associated with the Sprint Backlog.
Sprint Planning
The Scrum event that initiates the Sprint by defining why the Sprint is valuable, what can be done, and how the selected work will be delivered.
Sprint Retrospective
A Scrum event in which the Scrum Team inspects how it worked and identifies practical improvements to quality, effectiveness, and ways of working.
Sprint Review
A Scrum event in which the Scrum Team and stakeholders inspect the outcome of the Sprint, discuss feedback and changes in the environment, and collaborate on what to do next.
Stakeholder
An individual, group, or organization that may affect, be affected by, or perceive itself to be affected by a decision, activity, or outcome of a project, program, or portfolio.
Stakeholder Analysis
A method used to gather and assess information about stakeholders, their interests, influence, expectations, and potential impact on the project.
Stakeholder Collaboration
Using input from customers, stakeholders, subject matter experts (SMEs), and the team to inform product decisions.
Stakeholder Engagement Assessment Matrix
A matrix that compares current and desired stakeholder engagement levels.
Stakeholder Engagement Plan
A component of the project management plan that identifies the strategies and actions required to promote productive involvement of stakeholders in project or program decision making and execution.
Stakeholder Performance Domain
The PMBOK performance domain concerned with identifying, understanding, engaging, communicating with, and balancing the needs of stakeholders.
Stakeholder Register
A project document that includes information about project stakeholders including an assessment and classification of project stakeholders.
Statement of Work (SOW)
A narrative description of the products, services, or results to be supplied or delivered.
Status Meeting
A regularly scheduled meeting to exchange and analyze information about the current progress of the project and its performance.
Status Report
A communication describing the current condition, progress, performance, risks, issues, and outlook of the project.
Steering Committee
A group of senior stakeholders that provides governance, strategic direction, support, and decisions beyond the project team's authority.
Story Point
A team-specific relative unit used to estimate the size, complexity, risk, uncertainty, and effort of a Product Backlog item or user story. Story points are not hours and should not be compared across teams.
Strategic Plan
A high-level document that explains an organization’s vision and mission plus the approach that will be adopted to achieve this mission and vision, including the specific goals and objectives to be achieved during the period covered by the document.
Student Syndrome
Planned procrastination in which someone delays starting work until a deadline is close, reducing the time available to manage problems or uncertainty.
Sustainability
Creating value in a way that considers long-term economic, environmental, and social impacts.
SV
See Schedule Variance
Swarming
A technique in which multiple team members focus together on completing work or resolving an impediment.
SWOT
Strengths, Weaknesses, Opportunities, and Threats. See SWOT Analysis.
SWOT Analysis
Analysis of strengths, weaknesses, opportunities, and threats of an organization, project, or option.
Systems Thinking
Viewing a project and organization as an interconnected system and considering how decisions in one area create effects elsewhere.
T&M
See Time And Materials Contract
Tacit Knowledge
Personal knowledge that can be difficult to articulate and share such as beliefs, experience, and insights.
Tailoring
The deliberate adaptation of the development approach, governance, processes, methods, and artifacts to fit the project's unique context.
Target Price Contract
A contract that establishes an agreed target price and a mechanism for the buyer and seller to share cost savings or overruns.
Task Board
A visual board showing the status and movement of planned work. A Kanban board additionally emphasizes pull, work-in-progress limits, and flow.
Team Charter
A team-created document or working agreement that records shared values, expectations, decision rules, communication practices, conflict approaches, and acceptable behaviour.
Technical Debt
Future cost or rework created when a team chooses a faster or easier solution today, such as skipped testing, rushed design, or weak integration.
Test Plan
A document describing what will be tested, the tests to be performed, responsibilities, environments, and the processes used to evaluate results.
Threat
A risk that would have a negative effect on one or more project objectives.
Three-Point Estimating
An estimating method that uses optimistic, most likely, and pessimistic estimates to account for uncertainty.
Threshold
A predetermined value or limit that triggers attention, escalation, or action when reached.
Time and Materials Contract (T&M)
A contract that combines a fixed rate for labour or materials with payment based on the actual quantity used.
Timebox
A fixed maximum period in which an activity or body of work must be performed.
Tolerance
The quantified amount of acceptable variation for a requirement or project objective.
Trend Analysis
An analytical method that uses mathematical models to forecast future outcomes based on historical results.
Triangular distribution
A three-point probability distribution based on optimistic, most likely, and pessimistic estimates.
Trigger Condition
A predefined event or circumstance indicating that a risk has occurred or is about to occur and that a planned risk response should be implemented. Also known as a risk trigger.
Triple Bottom Line
A sustainability framework that evaluates value across three dimensions: people, planet, and profit.
Uncertainty
A lack of reliable knowledge about future events, conditions, or outcomes.
User Story
A short description of a feature or capability from the user's perspective, commonly written as: As a [type of user], I want [goal], so that [benefit].
VAC
See Variance At Completion
Validation
Confirming that a product, service, or result meets customer and stakeholder needs and is fit for its intended use.
Value
The worth, usefulness, or importance of something to stakeholders. Value may be tangible or intangible and may be defined differently by different stakeholders.
Value Delivery
The process of creating deliverables and outcomes that realize benefits and produce value for customers, the organization, and other stakeholders.
Value Proposition
A clear statement of the value a product, service, or solution is expected to provide to customers or users.
Variance
A measurable difference between actual performance and a baseline, plan, or expected value.
Variance Analysis
A method for determining the cause and degree of difference between the baseline and actual performance.
Variance at Completion (VAC)
The projected budget surplus or deficit at completion, calculated as budget at completion minus estimate at completion.
Velocity
The average amount of work, commonly measured in story points, that a specific team completes to its Definition of Done in a Sprint. Velocity supports forecasting and should not be used to compare teams.
Velocity Chart
A chart showing the amount of work a team completes in successive iterations to support forecasting and assess predictability.
Verification
Confirming that a product, service, or result complies with specified requirements, regulations, or conditions.
Virtual Team
A team whose members work in different locations and collaborate primarily through digital communication and shared tools.
Vision Statement
See Product Vision or Project Vision, depending on context.
Volatility
The speed and magnitude of change within a project or its environment.
VUCA
An acronym for volatility, uncertainty, complexity, and ambiguity. It describes environments in which conditions change quickly, outcomes are difficult to predict, many interconnected factors must be considered, and the meaning of available information may be unclear.
Waterfall
A commonly used term for a predictive or traditional approach in which scope, schedule, and cost are planned largely in advance and work generally progresses through sequential phases. See Predictive Approach.
WBS
See Work Breakdown Structure
WBS Dictionary
A document that provides detailed deliverable, activity, and scheduling information about each component in the work breakdown structure.
What-If-Scenario Analysis
The process of evaluating scenarios in order to predict their effect on project objectives.
Work Breakdown Structure (WBS)
A hierarchical decomposition of the total project scope into deliverables and manageable work packages.
Work in Progress (WIP)
Work that has been started but is not yet complete.
Work Package
The lowest level of the WBS at which cost, duration, and responsibility can be estimated and managed.
Work-in-Progress Limit (WIP Limit)
A maximum number of work items allowed in a workflow state at one time to improve flow, expose bottlenecks, and encourage finishing work before starting more.
Working Agreement
A team-created agreement describing how members will communicate, collaborate, make decisions, resolve conflict, and hold one another accountable. See Team Charter.